Author Topic: Trial Build/Maintenance Day – IMBA Trail & Lower Buckle Switch-back Climb  (Read 60 times)

0 Members and 1 Guest are viewing this topic.

Offline praveensm27

  • LDTR Committee
  • Newbie
  • *
  • Posts: 25

DATE & TIME: 

Saturday 19th of October 8:30am

REGISTRATION:

Link for the registration will be posted soon. We highly encourage you to sign in online. However, you are more than welcome to turn up on the day and sign in there.

MEETING POINT:

Parks VIC Deport (Just above the Skill Park) 13 Reservoir Road, Narre Warren North.

WORKS:

We will be working on IMBA Trail & Lower Buckle Switch-back climb to improve the drainage and maintenance of existing features.

BRING:

Water, food, shovel (If you prefer your own shovel), good shoes (preferably steel capped) and appropriate clothing for weather.

Please let us know if you are attending by replying on this forum thread, so we can organise tools and food etc.

If you have any question, please ask away.
BBQ and cold drinks will be provided for free to volunteers at the end of the build.
BYO food if you have a special food requirement.

Builds usually run for 4-6 hours and if you want to leave early or arrive late on that day, please message me on this forum or contact us via our form at www.lysterfieldmtb.com.
Hope to see you there.

Cheers.
 


Sent from my SM-G973F using Tapatalk


Offline praveensm27

  • LDTR Committee
  • Newbie
  • *
  • Posts: 25

Offline Matt

  • Jr. Member
  • **
  • Posts: 71
Hi committee,

Just a thought regarding the lower buckle switchback climb.  Now the trails are one way, it would be great to have a short, fairly direct upwards trail from the bottom of the switchback climb to the fork with the IMBA trail.  The switchback climb could then be made one way down.  That would mean you could whizz up, zoom down, whizz up again and continue with your loop. 

It is such a nice bit of flowy, downward pointing trail (which is exactly what Lysty needs more of).  It is a terrible shame for it to be upward only.

Cheers

Offline UnPC

  • LDTR Committee
  • Newbie
  • *
  • Posts: 25
Tim brought up re-opening the closed section past the gate for this purpose at the last working group meeting and the desire to turn it in to a descent didn’t seem to be met with much understanding or enthusiasm from Renae, but we did agree to review it on site when we look at the comm games rock garden.