Author Topic: VES COURSE 2019 Trail Maintenance  (Read 139 times)

0 Members and 1 Guest are viewing this topic.

Offline Nate

  • LDTR Committee
  • Hero Member
  • *
  • Posts: 946
  • Karma: 65535
VES COURSE 2019 Trail Maintenance
« on: May 07, 2019, 06:21:20 PM »
DATE & TIME: Saturday 11th May  8:30am 2019

REGISTRATION:
See below for the online registration link. We highly encourage you to sign in online. However, you are more than welcome to turn up on the day and sign in there.

https://www.parkconnect.vic.gov.au/secure-volunteer-home/secure-planned-activity/?id=f598bbac-1b6f-e911-80e7-0003ff6f6b00

MEETING POINT:
Parks VIC Deport (Just above the Skill Park) 13 Reservoir Road, Narre Warren North.

WORKS:
We will be working along the Golden Goat Challenge Course completing drainage and ensuring the course is all puddle free (as much as it can be) and touching up any excessively eroded areas where we can.

We will split up in to teams depending on how many are assisting for the build.

BRING:
Water, food, shovel (If you prefer your own shovel), good shoes (preferably steel capped) and appropriate clothing for weather.
Please let us know if you are attending by replying on this forum thread, so we can organise tools and food etc.
If you have any question, please ask away.
BBQ and cold drinks will be provided for free to volunteers at the end of the build.
BYO food if you have a special food requirement

Builds usually run for 4-6 hours and if you want to leave early or arrive late on that day, please message me on this forum or contact us via our form at www.lysterfieldmtb.com

Hope to see you there.

Cheers.

Sent from my SM-G930F using Tapatalk

LDTR Social Media & Head Trail Builder

Offline praveensm27

  • LDTR Committee
  • Newbie
  • *
  • Posts: 22
  • Karma: 0
Re: VES COURSE 2019 Trail Maintenance
« Reply #1 on: May 08, 2019, 11:09:41 PM »

Offline Nate

  • LDTR Committee
  • Hero Member
  • *
  • Posts: 946
  • Karma: 65535
Re: VES COURSE 2019 Trail Maintenance
« Reply #2 on: May 12, 2019, 05:44:53 PM »
An amazing effort by our volunteer trail builders yesterday. 7 volunteers worked on the Golden Goat Course Trails from 8:30am to 3pm, contributing over 45 hours (excluding admin work).

Through rain and sun, lots of mud and plenty of sweat; the four head trail builders, Jim, Lachie and Nate put in a solid amount of work and covered a lot of ground to help create trails that everyone can enjoy on the race next weekend.

Unfortunately, not every section of the course could be reached with the limited numbers of volunteers... however, we were able to:

Photo Album: https://www.facebook.com/pg/Lysterfieldmtb/photos/?tab=album&album_id=2206041372766378

🚵Drainage was completed along all of Redgum, most of Middle, some of the State MTB Course Track, some of Aneurysm. Some of these drains were needing quite a lot of attention and were severely blocked up.

🚵Improve drainage on three off-camber/down slope berms on the new/top section of Redgum trail.

🚵Reshaping the lip of the third last table-top on Aneurysm to remove an eroded ride line causing a puddle on the lip.

🚵Reshaping and improving drainage on the berm after the third-last table top of Aneurysm.

🚵Reshaping the left hand berm on Middle trail after the hip jump.

🚵Creating and clearing an S bend drain on the S berms in the middle of Middle Trail.

🚵Creating reverse grade drainage on the small jump before the berms before Donnelans Track to guide water away from the berms and through the pipe.

🚵Rebuilding the end of the berm just before Donnelans Track where a rock was starting to protrude at the end on to a tree due to erosion at the end.

We're hoping the weather stays perfect for the race so that the trails are hero dirt and everyone can enjoy the efforts of our hard working volunteers from yesterday.

Register for the Golden Goat Challenge here: https://my4.raceresult.com/122162/registration?lang=en

Photos thanks to Praveen and Nate.
LDTR Social Media & Head Trail Builder

Want to race at Lysterfield? Checkout the racing area!